✉ pe@qp.sgWhatsApp +65 9800 4385
PE Consultants Pte LtdFSC02 & Regulated Fire Safety Products

Fire-Rated Duct System FSC02 Endorsement

Self-supporting board ducts and protected sheet-metal ducts for ventilation, smoke control and kitchen exhaust.

Direct answerA fire-rated duct system is regulated under SCDF Fire Code 2023 Table 11A item 9 and requires a valid CoC and a DoC. For FSC02 endorsement, the Appropriate QP checks duct construction, size and orientation limits, hangers, penetration sealing and access doors against the certified system and the approved fire safety design.

Last reviewed: 24 September 2026 · Primary reference: SCDF Fire Code 2023, Chapter 11 and Table 11A · Prepared by PE Consultants Pte Ltd

Fire-rated duct system FSC02 checks

  • CoC, appendix and issue number
  • Project DoC
  • Duct type: board duct or protected steel duct
  • Fire-resistance period and exposure (inside/outside)
  • Maximum duct dimensions and orientation
  • Hanger and support spacing
  • Joints, stiffeners and access doors
  • Wall and floor penetration sealing
  • Installation photographs

Data centres, hospitals and mixed-use developments commonly have extensive fire-rated ductwork. Fire dampers are separately certified with labels — see the CoC and DoC review table. Penetrations are covered under fire stopping FSC02.

QP verification before FSC02

  1. Regulated and compliant product — the product falls within a Table 11A category and is certified for that use.
  2. Valid CoC — current, not withdrawn, suspended, terminated or superseded, verified in the Certification Body’s directory.
  3. Exact match to the CoC — brand, model, composition, thickness, configuration and manufacturer match the CoC and appendix.
  4. Representation of compliance — the DoC, serial label or certified mark required for that product is present and traceable.
  5. Correct installation — installed in accordance with the certified system and the approved fire safety design.

FSC02 endorsement is subject to review of the product documentation, certification scope, installation details and the QP’s professional assessment.

Our FSC02 work process

  1. Submit product and project informationSend the project details, CoC, DoC and product literature to pe@qp.sg or through the enquiry form.
  2. Review the product category under SCDF Table 11AWe confirm the regulated product category, the current Table 11A reference and whether FSC02 applies.
  3. Check the CoC, test reports, system scope and validityCoC number, issue number, holder, model and scope are checked against the Certification Body’s directory.
Ready to start? Send your CoC and product details to pe@qp.sg
  1. Check the DoC, serial label or certified markWhere applicable, we confirm the representation of compliance matches the certified product and the project.
  2. Inspect or verify the installed productQP site inspection or verification of the installation against the certified system and approved fire safety design.
  3. Prepare the FSC02 endorsement and supporting documentsSubject to satisfactory review, we prepare the FSC02 endorsement and supporting submission documents.
Send your CoC and product details to pe@qp.sgRequest FSC02 Assessment

Frequently asked questions

Does a fire-rated duct system require a DoC?

Yes. A fire-rated duct system (Table 11A item 9) requires a valid CoC and DoC. The QP checks the duct construction, size limits, orientation, hangers and supports, penetration sealing and access panels against the certified system.

Can a product be used if its CoC model differs from the installed model?

Generally no. The installed product must match the CoC exactly — brand, model, composition, thickness, density, configuration and manufacturer. A different model, revised build-up or alternative manufacturer needs its own CoC coverage, or a revised CoC issued by the Certification Body. The QP cannot extend a CoC’s scope by professional judgement. See CoC and DoC review.

Can a contractor substitute a different fire-rated product during construction?

Only with care. A substitute must be a regulated product with its own valid CoC covering the exact model and configuration, the required DoC or labels, and it must suit the approved fire safety design. Changes to tested assemblies, supporting structure or penetration details may require design review. PE Consultants provides product substitution review before the change is made.

Request FSC02 Assessment

Send your CoC, DoC, product details and installation information to PE Consultants Pte Ltd. FSC02 endorsement is subject to review of the product documentation, certification scope, installation details and the QP’s professional assessment.

Email: pe@qp.sg  |  WhatsApp: +65 9800 4385

Official sources

Last reviewed: 24 September 2026. Regulatory references are to the SCDF Code of Practice for Fire Precautions in Buildings 2023 (Fire Code 2023), Chapter 11 and Table 11A.

WhatsApp WhatsApp